Boiler Solide fuel Cangkang Sawit
Subject : COAL/SOLID FUEL BOILER 10 TPH (LOCAL FABRICATION)
Bersama ini kami sampaikan penawaran steam boiler sebagai berikut:
– | Boiler type | : IDM10TPH-10 | |
– | Rated Capacity | : 10.000 Kg/Hr | |
– | Rated Pressure | : 14 | Kg/Cm2 |
– | Feed water temperature | : 105 Deg C |
-
TECHNICAL PROPOSAL
Boiler
Combined water tube – fire tube steam boiler , consist of ;
- Forced draft combustion air fan
- Water tube pre-furnace combustion chamber
- Fire Tube Boiler convection drum
- Multi-Cyclone De-duster Unit Flue gas
- ID fan (Flue Gas Fan)
- Chimney 15 m
- Fuel Hopper and Silo (Fuel Feeding) with Bucket elevator
Spesifikasi dan karakteristik
Pembakaran yang optimal dan perpindahan panas maksimum dengan system tungku basah, dengan ruang yang luas, pembakaran tidak kontak dengan dinding dingin tungku . Pemanasan permukaan tungku besar menyempurnakan transfer panas yang maksimal. Akibatnya suhu gas buang sudah berkurang jauh,sebelum memasuki tabung api. Konsep ini tidak hanya mengurangi beban pada pelat tabung (yang menjamin kekuatan jangka panjang) danjuga menghindari abu meleleh menempel pada tabung api
Perawatan mudah & aksesibilitas
Pembakaran yang optimal dan dipilih dengan cermat kecepatan gas buang di tabung api mengurangi kekotoran tabung api untuk minimum. Aksesibilitas terjamin melalui pintu.
konstruksi yang solid
Tabung api digulung dan dilas yang menghasilkan:
- kontak erat antara firetube dan piring tabung, untuk menghindari celah adanya korosi outsticking tabung-ujung pada pelat tabung, sehingga pendinginan lengkap terjamin
- tidak ada kekotoran didalam antara tabung pembakaran dan piring tabung Kontrol kualitas fabrikasi:
Material & Construction
Plates material of pressure ,part SA 516gr.70
Tube material of pressure ,part barnd Benteler /Mannesmann mfg France/Germany
Material/thickness thermal isolation, Rock wool/100mm
Material / thickness of cladding, almunium sheet/ 07mm
Frame material /other plates, ASTM 36/(Mild Steel)
Water/Steam / Oil pipes (Outside) ASTM A 106 Gr B
Boiler equipments
o 1 vent valve
o 3 drain valves
o 2 water level gauge
o 2 Feed Water pumps with electrical motor mounted on a steel frame.
o Accessories : Main valve, Inlet Feed Water Valve with Check Valve and Blowdown Valve
Safe operation
Regulation and safety pressurestat determine respectively the required and maximum working pressure.
Control and safety devices:
o 1 safety Pressure witch
o 1 manometer
o 1 regulation Pressure Transmitter with digital isplay
o 1 Water Level Control
o 1 Water Level Switch Safety o 1 flue gas temp.gauge
o 2 safety valves
Control panel Boiler
1 Free Standing Electric Switch Box: The type control panel suitable for floor mounting pre-wired control for all primary components.
Operating voltage 380 V, 3 Phase, Neutral, Control voltage 220 V, single phase, 50 Hz.
Centralized control panel with the following items:
- Control and Main voltage
- High pressure – manual reset
- Low pressure – automatic reset
- Low water level – automatic reset
- Low low water level – manual reset
- Flame failure/High Temperature Furnace
| Base Control | : Boiler Steam Pressure |
| Operation Feeding | : On Off /High- Low Pressure Steam |
Cyclone De-duster Unit Flue gas
Dust Collector c/w Cast Iron Swirl Tube & Dust Bin
Type Multi-Cyclon
Dimension 2500 L x 1500 W x 4100 H mm
Thickness Of Casing 5 mm
Painting Heat Resistance Quality Paint
Material SA 36 (Mild Steel)
Engineering document
Basic document which provided by IDM
- Plant lay-out drawing & Load plan for foundation
- Schematic diagram
- Electrical connection
- Electrical diagram
- Instruction manual regarding the operation and maintenance
- PRICE & COMMERCIAL TERMS
- Forced draft combustion air fan
- Water tube pre-furnace combustion chamber
- Fire Tube Boiler convection drum
- Cyclone De-duster Unit Flue gas
- ID fan (Flue Gas Fan)
- Chimney 12 m
EXCLUDED CONDITION (Balance of Plant) :
- Power House, Civil Work and anchor bolt.
- All Foundation of Equipment’s
- External piping from steam header nozzle outlet.
- Transformer, Electrical Transmission and distribution to plant.
- Lighting
- Fire Fighting Equipment’s and system
- Water treatment and Demineralization Plant
- Waste water Treatment
- Heavy Lifting to Foundation
DELIVERY TIME :
3 – 4 Months after placing the order, receipt of down payment and after all technical and commercial matters are cleared.
TERMS OF PAYMENT :
- 50% Down payment against total amount upon sign contract.
- 40% After Delivery
- 5 % After Commissioning test
- 5% Retensi selama 6 bulan
VALIDITY PRICE :
Our offer is valid for thirty (30) days from date of this offer.
WARRANTY :
We assume guarantee is for 12 months after steam test or 18 months after Boiler at site whichever is earlier.