Thermal Oil Heater 1000 Mcal/h ( Riello Oil Burner)\

| Bersama ini kami sampaikan penawaran harga Thermal Oil Heater terlampir sebagai berikut: | |||||||||
| 1 | Thermal Oil Heater 1000 Mcal/h ( Riello oil Burner) | |||||||||
| Thermal Capacity | 1.000.000 | Kcal/h | ||||||||
| Coil Pipe Heater Benteler Germany dan Setara | 60,3×3,2 | mm | ||||||||
| Efficiency at 100 % of the load | 88 +- | % | ||||||||
| Design Temperature | 300 | °C | ||||||||
| Test Pressure | 10 | barg | ||||||||
| Max.thermal fluid temperature | 280 | °C | ||||||||
| Pessure drop fluid temperature ΔP | 1,1 | bar | ||||||||
| Max ΔΤ between outlet and inlet temp | 30 | °C | ||||||||
| Length (TOH Only) | 3.950 | mm | ||||||||
| Width(TOH Only) | 1.940 | mm | ||||||||
| Height (TOH Only) | 2.250 | mm | ||||||||
| Thermal oil inlet flange | 80 | DN | ||||||||
| Thermal oil outlet flange | 80 | DN | ||||||||
| Thermal oil drain flange | 25 | DN | ||||||||
| Termal Oil Volume in the boiler | 540 | liter | ||||||||
| Boiler empty weight | 2.800 | Kg | ||||||||
| Consumption Gas (LNG) Load 100% | 105 | Nm³/h | ||||||||
| Sirkulasi Pump Charateristics ,Flow rate | 100 | m³/h | ||||||||
| Pump Head | 60 | meter | ||||||||
| Instalasi total electric power | 22 | KW | ||||||||
| Insulation Calding Stainless | 1 | lot | ||||||||
| Pessure Guage With Switch – Wika | 2 | Unit | ||||||||
| Temperatur Control ( Jumo Germany) | 3 | unit | ||||||||
| Box Panel ( Scheneider France) dan setara | 1 | Unit | ||||||||
| 2 | Pump Oil Heater SIHI/ KSB (germany) dan setara | 1 | Set | |||||||
| 3 | Gas Burner Press 4G | 1 | set | |||||||
| 4 | Expantion tank ( Oil ) C/W Support | 500 | liter | |||||||
| 5 | Colecting tank ( Sump tank Oil ) | 1.000 | liter | |||||||
| 6 | Stack (Cerobong) Diameter 320 t.5.5 mm | 6 | Mtr | |||||||
| 7 | Ari Armaturen Bellow Seal Globe Valve DN80 PN16 | 1 | Ea | |||||||
| 8 | Ari Armaturen Bellow Seal Strainer DN80 PN16 | 1 | Ea | |||||||
| 9 | Ari Armaturen Bellow Seal Globe Valve DN 65 PN16 | 3 | Ea | |||||||
| 12 | Gasket/seal SWG + Mur dan Baut | 1 | lot | |||||||
| 13 | Pemipaan di area TOH | 1 | lot | |||||||
| 15 | Isolasi Pipa | 1 | lot | |||||||
| 16 | Kerangka casis | 1 | lot | |||||||
| 18 | Commissioning | 1 | lot | |||||||
| Keterangan | : | Harga belum Termasuk PPN | ||||||||||||
| Alat angkat Unloading (porklif/Crane) | ||||||||||||||
| Tidak termasuk pekerjaan Sipil | ||||||||||||||
| Cable Power dari panel distribution | ||||||||||||||
| Belum termasuk pemipaan ke lin produksi akan di tawarkan terpisah | ||||||||||||||
| Delivery | : | Prangko sadang Purwakarta | ||||||||||||
| Payment | : | 40% Uang Muka | ||||||||||||
| 40% Sebelu barang dikirim | ||||||||||||||
| 15% Selesai Pemasangan (Giro 30 Hari) | ||||||||||||||
| 5% Retensi selama 3 bulan (Giro 90 hari) | ||||||||||||||
| Vadility | : | 3 Minggu | ||||||||||||
| Pabrikasi | : | 8 -10 Minggu (setelah dapat uang muka) | ||||||||||||
| Pemasangan | : | 2 minngu | ||||||||||||
| Garansi | : | 1( Satu) tahun atau 18 (delpan belas) bulan setelah barang dikirim | ||||||||||||
| Demikian penawaran kami, atas perhatian dan kerjasamanya terimakasih | ||||||||||||||
|
||||||||||||||
| Ratman | ||||||||||||||
| WA: 0813 88 666 204 | ||||||||||||||